0 ratings
Waterproof Dog Training Leash 50FT 30FT 15FT 10FT 5FT Heavy Duty Recall Long Lead for Large Medium Small Dogs (5FT, Blue)
Elevate your dog's recall skills with our waterproof leash, designed for outdoor adventures and built to last in any weather.
Waterproof Dog Training Leash 50FT 30FT 15FT 10FT 5FT Heavy Duty Recall Long Lead for Large Medium Small Dogs (5FT, Blue)
Item #: 74347969

Waterproof Dog Training Leash 50FT 30FT 15FT 10FT 5FT Heavy Duty Recall Long Lead for Large Medium Small Dogs (5FT, Blue)

Item #: 74347969

IMP 25

Price Details

Excluding Shipping & Custom charges ( Shipping and custom charges will be calculated on checkout )

*All items will import from US

0 ratings Write a review
In stock
us Imported from USA store

QTY:

Order now and get it around Wednesday, October 28
Our Top Logistics Partners
  • fedex
  • dhl
Elevate your dog's recall skills with our waterproof leash, designed for outdoor adventures and built to last in any weather.
U-Care Warranty:
None
Select a Plan
fast shipping

Fast
Shipping

free return

Free
Return*

secure packaging

Secure Packaging

100% original products

100% Original Products

pci-dss

PCI DSS Compliance

iso certified

ISO 27001 Certified


paypal payment
visa payment
mastercard payment
Note: Step Down Voltage Transformer required for using electronics products of US store (110-120). Recommended power converters Buy Now.

What Stands Out

Waterproof Material
Constructed with high-quality waterproof material, ensuring durability in wet conditions and easy cleaning after training sessions, enhancing the longevity of the leash.
Multiple Lengths
Available in various lengths (5FT to 50FT), catering to different training needs, providing flexibility for recall training and ensuring a comfortable experience for dogs of all sizes.
Heavy Duty Design
Designed to withstand the pulling strength of large, medium, and small dogs, offering a reliable and safe training tool that instills confidence in both trainers and pets.

Product Details

Shop Waterproof Dog Training Leash 50FT 30FT 15FT 10FT 5FT Heavy Duty Recall Long Lead for Large Medium Small Dogs (5FT, Blue) online at a best price in Isle of Man. B08629589S
Brand NameNIMBLE
Dog Breed SizeLarge, Medium, Small
Unit Count1 Count
Pet TypeDog
ManufacturerNimble
UPC884710679479
Included Componentsone dog leash
Item Type Namedog leash
Model Numberdog leash
Manufacturer Part Number01
Target SpeciesDog
Size5FT
Item Dimensions L x W60"L x 0.4"W (152.4 x 1 cm)
Material TypeNylon
Closure TypeHook and Loop
ColorBlue
PatternDog
Product Dimensions 60 x 0.4 x 0.04 inches (152.4 x 1 x 0.1 cm); 4.16 ounces (117.94 grams)
BrandNIMBLE
MaterialNylon
Product Dimensions (L x W x H)60"L x 0.4"W (152.4 x 1 cm)

Who Should Buy?

Suitable For
  • Training Sessions

    Ideal for dog trainers needing a reliable, long lead for recall exercises and behavior correction during training.

  • Outdoor Adventures

    Perfect for pet owners who enjoy hiking or outdoor activities, allowing dogs to explore safely while under control.

  • Water Activities

    Great for dogs that love water, as the leash is waterproof and can withstand wet conditions without damage.

Not Suitable For
  • Small Spaces

    Not suitable for urban environments with limited space, as longer leads can lead to tangles and control issues.

Product Description

Waterproof Dog Training Leash 50FT 30FT 15FT 10FT 5FT Heavy Duty Recall Long Lead for Large Medium Small Dogs (5FT, Blue)

Have any Query? Chat with us

Customer Questions & Answers

  • Question: How to Shop Waterproof Dog Training Leash 50FT 30FT 15FT 10FT Online From Ubuy?

    Answer: It’s easy to shop Waterproof Dog Training Leash 50FT 30FT 15FT 10FT online from Ubuy. You just have to search for the product, choose your shipping method while checking out and get it delivered to your location.
  • Question: Is Waterproof Dog Training Leash 50FT 30FT 15FT 10FT Available to Shop Online in Isle of Man?

    Answer: Yes, at Ubuy Isle of Man this product is available for you to shop at a reasonable price. The Waterproof Dog Training Leash 50FT 30FT 15FT 10FT is not available locally but you can trust us with our express shipping services.
  • Question: How Long Does It Take to Get Product After Placing the Order?

    Answer: The delivery time of your ordered product varies as per what you've ordered and the shipping method that you've chosen. The estimated delivery time is mentioned during the checkout process, so be carefree while shopping.

NIMBLE Training Leashes dog leash Editorial Review

The Waterproof Dog Training Leash has received mixed reviews from customers. Some users appreciate its durability and ease of cleaning, citing it as a great tool for training and outdoor activities such as beach walks. The leash's sturdiness is highlighted by users, especially for handling strong and active dogs. Its smooth surface and relative lightweight make it comfortable for handling during walks. However, some users noted that the leash was easily chewed through by their dogs, leading to concerns about its suitability for more excitable or nibbly pets. The leash's connection point to the dog collar was identified as a weak point. Users also pointed out that the leash may be too heavy for smaller or younger dogs. Overall, while the leash is praised for its functionality and durability, it may not be the best choice for dogs prone to chewing or those who are still growing or smaller in size.

Customer Reviews & Ratings

5.0
1 customers ratings
  • 5 Star
    100%
  • 4 Star
    0%
  • 3 Star
    0%
  • 2 Star
    0%
  • 1 Star
    0%

Review this product

Share your thoughts with other customers

Pros

  • Waterproof and handles abuse well
  • Easy to clean and suitable for outdoor activities
  • Sturdy and relatively lightweight
  • Comfortable for handling during walks

Cons

  • Easily chewed through by some dogs

Product Price History

Important information

  • Limitations : For products shipped internationally, please note that any manufacturer warranty may not be valid; manufacturer service options may not be available; product manuals, instructions, and safety warnings may not be in destination country languages; the products (and accompanying materials) may not be designed in accordance with destination country standards, specifications, and labeling requirements; and the products may not conform to destination country voltage and other electrical standards (requiring use of an adapter or converter if appropriate). The recipient is responsible for assuring that the product can be lawfully imported to the destination country. When ordering from Ubuy or its affiliates, the recipient is the importer of record and must comply with all laws and regulations of the destination country.
  • Not all the products listed on Ubuy are for sale, as Ubuy is a global search engine. Products are subject to export/trade regulations.