- Home Page /
- Pet Supplies /
- Dog Supplies /
- Dog Collars Harnesses & Leashes /
- Dog Collars /
- Basic Collars /
- AWISZZZ Pets Dog and Cat Gothic Leather Colla...
AWISZZZ Pets Dog and Cat Gothic Leather Collar Tie Long Lead Chain Strong Durable with Love Lock and Collar Necklace Neck Size Adjustable Collar for
Ubuy works hard to protect your security and privacy. Our advanced payment security system ensures confidentiality by encrypting your information during transmission using AES (Advanced Encryption Standards) and SSL (Secure Socket Layer) protocols. Your payment details are 100% secure as we do not share your payment details with third party sellers.
Fast
Shipping
Free
Return*
Secure Packaging
100% Original Products
PCI DSS Compliance
ISO 27001 Certified
Product Details
| Brand Name | AWISZZZ |
| Breed Recommendation | Medium |
| Dog Breed Size | Medium |
| Item Length | 20 Inches (50.8 cm) |
| Manufacturer | AWISZZZ |
| Pet Type | Cat, Dog |
| UPC | 768655427640 |
| Manufacturer Part Number | Red |
| Model Number | Red |
| Target Species | Dog |
| Age Range Description | All Life Stages |
| Item Dimensions L x W | 20"L x 2"W (50.8 cm) |
| Number of Items | 1 |
| Unit Count | 1.00 Count |
| Size | 2x20 in (558.8 cm) |
| Pattern | Hearts |
| Color | Red |
| Material Type | Leather |
| Product Care Instructions | Clean after Use |
| Closure Type | Buckle |
| Embellishment Feature | heart lock |
| Product Dimensions | 20 x 2 x 0.2 inches (50.8 x 5.1 x 0.5 cm); 6.4 ounces (181.44 grams) |
| Material | Leather |
| Brand | AWISZZZ |
Product Description
AWISZZZ Pets Dog and Cat Gothic Leather Collar Tie Long Lead Chain Strong Durable with Love Lock and Collar Necklace Neck Size Adjustable Collar for Women Pets - Red
Important information
- Limitations : For products shipped internationally, please note that any manufacturer warranty may not be valid; manufacturer service options may not be available; product manuals, instructions, and safety warnings may not be in destination country languages; the products (and accompanying materials) may not be designed in accordance with destination country standards, specifications, and labeling requirements; and the products may not conform to destination country voltage and other electrical standards (requiring use of an adapter or converter if appropriate). The recipient is responsible for assuring that the product can be lawfully imported to the destination country. When ordering from Ubuy or its affiliates, the recipient is the importer of record and must comply with all laws and regulations of the destination country.
- Not all the products listed on Ubuy are for sale, as Ubuy is a global search engine. Products are subject to export/trade regulations.
Currently unavailable.
We don't know when or if this item will be back in stock.
This item is not restrict in my country.(Please click on above link if this item is not restrict in your country, So our team will review and allow.)
PCI DSS compliant and ISO 27001:2022 certified, with encrypted payments and full buyer protection on every order.
Ubuy Assurance
Experience worry-free shopping with 100% original products, PCI DSS-compliant payment security, ISO 27001-certified data protection, the fastest cross-border delivery, free returns *, and secure packaging on every order.